Consultancy Assignments:     
  

Major Consultancy Engineering Projects (concept to commissioning) for complete Power projects Undertaken by Desein:
    

S.No.

PROJECT

CLIENT

NO. OF UNITS

UNIT SIZE(MW)

TOTAL CAP (MW)

  COAL/LIGNITE FIRED POWER PROJECTS

   

1.

CHANDRAPUR STAGE - III

MSEB

1

500

500

2.

KRISHNAPATNAM

BBI Power (USA)

2

250

500

3.

KOTHAGUDEM-V

APSEB

2

250

500

4.

MUZAFFARPUR-II

BSEB

2

250

500

5.

BALAGARH

BLAGARH Power Co.

2

250

500

6.

ROPAR-II

PSEB

2

210

420

7.

KOTA-II

RSEB

2

210

420

8.

PANIPAT-III

HSEB

1

210

210

9.

GANDHINAGAR-II

GEB

2

210

420

10.

VIJAYAWADA -II

APSEB

2

210

420

11.

ROPAR-III

PSEB

2

210

420

12.

RAYALASEEMA-I

APSEB

2

210

420

13.

IB-I

OPGC

2

210

420

14.

KOTA-III

RSEB

1

210

210

15.

VIJAYAWADA-III

APSEB

2

210

420

16.

TENUGHAT-II

TVNL

3

210

630

17.

RAICHUR-III

KPCL

2

210

420

18.

RAYALASEEMA-II

APSEB

2

210

420

19.

SABARMATI-B

AECO

1

120

120

20.

AKRIMOTA LIGNITE

GMDC

2

125

250

21.

KOTHAGUDEM-IV

APSEB

2

110

220

22.

TALCHER-II

OSEB

2

110

220

23.

PATRATU-IV

BSEB

2

110

220

24.

KOTA-I

RSEB

2

110

220

25.

PARICHHA-I

UPSEB

2

110

220

26.

TANDA-I

UPSEB

4

110

440

27.

PANIPAT-II

HSEB

2

110

220

28.

KUTCH LIGNITE-I

GEB

2

70

140

29.

RENUSAGR

RPC

2

70

140

30.

KUTCH LIGNITE-II

GEB

1

75

75

31.

RAIGARH

JINDAL STEEL

1

70

70

32.

PALONCHA

NBFAL

1

50

50

33.

KOTA CPP

SFC

1

30

30

34.

SABARMATI-C

AECO

2

30

60

35.

RENUKOOT CPP

KANORIA

1

25

25

36.

DAHEJ CPP

IGFCC

1

24.5+10

34.5

37.

RAIGARH

JINDAL

4+2

20

10

38.

BARAUNI

HFCL

1

16

16

39.

PANIPAT

NFL

2

15

30

BAGASSE BASED COGENERATION      

40.

GSML-SAMEERWADI

GODAVARI SUGAR

1

24

24

   GAS TURBINE COMBINED CYCLE POWER PLANTS  

41.

VIJJESWARAM-I

APSEB

-

-

100

42.

UTRAN-I

GEB

-

-

135

43.

PIPAVAV-I

GEB

-

-

600

44.

SAMALKOT

BSES

-

-

230

45.

HAZIRA

GSPC

-

-

160

46.

SAMALKOT

NCC

-

-

230

47.

KUTTALAM

TNEB

-

-

65

48.

MATON

HZL

-

-

100

49.

DHUVARAN

GSECL

-

-

100


Consultancy assignments for IPPs:

Major Consultancy assignments undertaken for IPPs include :

 

Name of power project Capacity Owner
Krishnapatnam 'B' Project 2 x 260 MW BBI Power, USA
SamalKot Combined Cycle Project 230 MW BSES Andhra Power
Combined Cycle Project at Hazira 160 MW Gujrat State Petroleum Corp.
Dhuvaran Combined Cycle Project 110 MW Gujrat State Electricity Corp. Ltd
Yamunanager Project 2 x 350 MW Eisenburg Group, Israel
Lapanga Project 2 x 250 MW Panda Energy Corp. , USA
Balagarh Project 2 x 250 MW RPG Group
Mandya Combined Cycle Project 160 MW Mandya Power Partners
Bhilai Project 2 x 250 MW CEA, USA
Diesel Engine Based Project at Dharwad 42 MW INOX
Samal Kot Combined Cycle Project 230 MW NCC Power Corporation
Naphtta Liquid Fuel based CPP 100 MW Hindustan Zinc Ltd



                                   


Home | Company Profile | Tie Ups | Services | Performance | International Projects