LANDMARKS
Commissioning of a 210 MW Coal Fired
at Unit in a record time of 27 month
at
Raichur TPS, Unit#5 of Karnataka
Power Corporation Limited
(KPCL)
Commissioning of a 210 MW Coal Fired
Unit in a record time of 31 months
at
Kothagudem Unit #9 of Andhra Pradesh
State Electricity
Board (APSEB).
|
| ACHIEVEMENTS |
|

|
Successfully engineered and commissioned a 500MW
unit at Chandrapur TPS under World Bank Financing
|
|
|
First among power consultants to introduce the Distributed
Digital Computer System in large thermal power stations in
India
|
|
|
First GE FRAME#6(GT-33MW) combined cycle power plant of
100MW, manufactured by Bharat Heavy Electricals Limited (BHEL)
was engineered and commissioned at Vijeswaram for APSEB.
|
|