Low capital cost without sacrificing operational efficiency / relability
         
Maintaining schedules in designing & construction activities
         
Solutions to environmental requirements  
            
       
       

      
LANDMARKS

  
Commissioning of a 210 MW Coal Fired
      at Unit in a record time of 27 month at
      Raichur TPS, Unit#5 of Karnataka
      Power Corporation Limited (KPCL)

  
Commissioning of a 210 MW Coal Fired
      Unit in a record time of 31 months at
      Kothagudem Unit #9 of Andhra Pradesh
      State Electricity Board (APSEB).
           
 ACHIEVEMENTS          

 


   

  

Successfully engineered and commissioned a 500MW unit at Chandrapur TPS under World Bank Financing
       

 

First among power consultants to introduce the Distributed Digital Computer System in large thermal power stations in India
      

 

First GE FRAME#6(GT-33MW) combined cycle power plant of 100MW, manufactured by Bharat Heavy Electricals Limited (BHEL) was engineered and commissioned at Vijeswaram for APSEB.
        
           

Introduction of Innovative Ideas at Vijayawada TPS

  
  Single-Pass Tower Type Boilers 
  
  Concrete Columns for Bioler Structures 
  
  Back End Arrangement of Coal Mills 
  
   Variable Frequency Drives for ID Fans 
  
  Direct ignition pulverised Coal Burners 
  
  Distributed Digital Computer Control
       System

    

                                   

Home | Company Profile | Tie Ups | Services | Performance | International Projects