15MW GT-Khetri Copper Complex Technofab 2 Post-Operational
Heat Exchanger-Khetri Copper Complex HCL Lot Post-Operational
120TPH, Natural Circulation Boiler-SPIC Thermax 2 Post-Operation
140MW, B&W Boilers-Dhuvaran TPS GEB 2 Post-Operational
260TPH, Natural Circulation Boiler-Durgapur CPP SAIL 2 Pre-Commissioning
260TPH, Natural Circulation Boiler-Bokaro CPP Elektrim 3 Pre-Commissioning
240TPH, Kothagudem TPS APSEB 4 Post-Operational
180TPH Natural Circulation Boiler-GNFC Bharuch Thermax 1 Pre-Commissioning
Air Compressor-Mathura Refinery IOCL Lot Post-Operational
27TPH Boiler-Barauni BHPV 2 Pre-Commissioning
280TPH, AVB Boiler-Indraprastha TPS DESU 1 Post-Operational
387TPH, 120MW Boiler-Sikka TPS GEB 1 Pre-Commissioning
375 TPH, 110MW Boiler- Guru nank Dev TPS PSEB 1 Post-Operational
45TPH,Satyamangalam, NT Bannari Amman Sugar 1 Post-Operational
75TPH,BHPV Boiler-Nepanagar, MP BHPV 1 Post-Operational
99TPH, Swedish Boiler-Choudwar, Cuttak ICCL 1 Pre-Commissioning
48TPH-Visakhapatnam, AP CFL 1 Post-Operational
60TPH-Cochin Kerala BHPV 3 Pre-Commissioning
Fuel Oil Pipiline-Korba NTPC 1 Pre-Commissioning
Turbine Lube Oil System-Saktinagar, UP NTPC 1 Post-Operational
Turbine Lube Oil System-Panipat & Bhatinda Somafer, Germany 4 Post-Operational
700TPH, Reformed Gas Boiler-Tuticorin, NT SPIC 2 Post-Operational
60MW Boilers-EnnoreTPS, NT TNEB 2 Post-Operational
70MW Boilers-Kutch Lignite TPS Gujarat GEB 2 Pre-Commissioning
130TPHVU Boiler-Fertilizers Nagar, Gujarat Petron 1 Pre-Commissioning
45TPH Boiler-Coimbatore NT Bannari Amman Sugars 1 Post-Operational
80TPH Boiler-Ambalamedu, Cochin BHPV 1 Pre-Commissioning
1x110MW & 1x55MW Boiler-Harduaganj TPS, UP UPSEB 2 Post-Operational
280TPH AVB Boiler-Indraprastha TPS, New Delhi DESU 1 Post-Operational
4x140MW Lube Oil Lines-Dadri, UP NTPC 4 Pre-Commissioning
Inter-Coolers of Air Compressors-Kashipur, UP IGL 2 Post-Operational
375TPH 110MW boiler-Guru Nanak Dev TPS, Punjab PSEB 1 Post-Operational
75TPH John Thompson Boiler-Kota, Rajasthan JK Synthetics Limited 1 Post-Operational
20TPH Boiler-Choudwar, Cuttack, Orissa BILT 2 Post-Operational
35TPH Boiler-Ambalamedu, Kerala BHPV 1 Pre-Commissioning
375TPH 110MW Boiler-Panipat TPS, Haryana HSEB 1 Post-Operational
375TPH 110MW Boiler-Guru Nanak Dev TPS, Punjab PSEB 1 Post Operational
700TPH 210MW Boiler-Vijayawada TPS, AP APSEB 1 Post-Operational
2x500 MW Ansaldo Boilers-Farakka STPP, WB NTPC 2 Pre-Commissioning
2X300 MW WHR Boiler Kawas CCPP, Gujarat NTPC 4 Pre-Commissioning
4x140MW GT 12 LO Pipelines-Dadri, UP NTPC 1 Post-Operational
Inter Coolers of Air Compressor Kashipur, UP Indian Glyco Limited 5 Post-Operational
375TPH 110MW Boiler-Patratu TPS, Bihar BSEB 1 Post-Operational
2x500 MW Boilers-Anpara, UP UPSEB 2 Pre-Commissioning
1x140MW Boiler-Nasik TPS, Maharashtra MSEB 1 Post-Operational
110MW Boiler-Kota TPS, Rajasthan RSEB 1 Post-Operational
2x30TPH110MW Boiler-Nagapattinam, NT BHPV 1 Pre-Commissioning
210MW Boiler-Guru Gobind Singh TPP, Punjab PSEB 1 Post-Operational
2x30TPH110MW Boiler-Nanjangud, Karnataka Bannari Amman Sugars 2 Post-Operational
40TPH & 30TPH 110MW Boilers-Satyamanglam, NT Bannari Amman Sugars 2 Post-Operational
75MW Boiler-Kutch Lignite TPS, Gujarat GEB 1 Pre-Commissioning
2x110MW Condenser Cleaning-Muzzaffarpur TPS, BSEB 2 Post-Operational
2x250MW Boiler-Budge Budge, WB CESC 2 Pre-Commissioning
2x60 TPH Boilers-Udyogmandalam, Kerala FACT 2 Pre-commissioning
1x120MW Condenser Cleaning-Chandrapur STPP, MSEB 1 Post-Operational
1x3WHRB-Gandhinagar TPS, Gujarat GB 3 Pre-Commissioning
 

   
                                   